This is a 28 level office building in Sacramento. Using silicone sealant and silicone preformed tape Alpha Restoration & Waterproofing wet glazed the curtain wall and metal-to-metal joinery. The repairs performed successfully sealed the entire building which had a history of leaks ever since it was constructed in 1989.